Real-time anomaly detection across all monitored assets
💡 Why this?
Anomaly Radar uses multi-signal analysis combining sensor data, shift logs, and historical patterns to detect deviations.
All (6) Critical (2) Warning (2) Info (2)
Anomaly Age Tracking
EOT Crane #3
2h 15m
Critical
Cooling Tower 2
5d 3h
Warning
Hydraulic Press B
3d 1h
Warning
Boiler Pump #1
4h 30m
Info
EOT Crane #3 — Bearing OverheatCritical
10:23 AM · Age: 2h 15m
Bearing temperature at 95°C, threshold is 85°C. Risk of seizure if not addressed.
💡 Recommended: Immediate shutdown and bearing inspection. Estimated repair: 4-6 hours.
EOT Crane #3 — Load Cell VarianceCritical
6:50 AM · Age: 5h 48m
Load cell readings showing ±2.5% variance during lifts. Safety risk for heavy loads.
💡 Recommended: Recalibrate load cells. Restrict loads to 15T until resolved.
Hydraulic Press B — Pressure DropWarning
9:45 AM · Age: 2h 53m
System pressure dropped to 180 bar from 220 bar baseline. Possible relief valve issue.
💡 Recommended: Check relief valve and hydraulic lines for leaks.
Cooling Tower 2 — Sensor DriftWarning
8:30 AM · Age: 4h 8m
Temperature sensor showing 3.2°C drift from calibrated baseline. Affecting readings.
💡 Recommended: Recalibrate or replace temperature sensor PT-201.
Boiler Pump #1 — Vibration IncreaseInfo
7:15 AM · Age: 5h 23m
Vibration levels 12% above normal. Within acceptable range but trending upward.
💡 Recommended: Monitor closely. Schedule gland packing check during next PM window.
Conveyor Belt A — Speed FluctuationInfo
11:05 AM · Age: 1h 33m
Belt speed varying ±5% from setpoint. VFD parameters may need adjustment.
💡 Recommended: Check VFD settings and belt tension during next break.
Total Anomalies
23
↓ 25.8% vs last month
Avg Production
96.4%
↑ 2.3% vs last month
Total Downtime
5.2 hrs
↓ 33.3% vs last month
Month-over-Month Comparison
Metric This Month Last Month Delta
Anomalies 23 31 ↓ 25.8%
Downtime 5.2h 7.8h ↓ 33.3%
Production Achievement 96.4% 94.1% ↑ 2.3%
Handover Quality Score 8.7/10 7.9/10 ↑ 10.1%
Critical Flags 5 9 ↓ 44.4%
Cost Impact Summary
Total Risk Exposure: ₹4,45,000/shift
💡 Why this?
Asset Memory builds a knowledge graph from shift logs, maintenance records, and anomaly patterns.
EOT Crane #3
20T · Bay 3 · IS:3177 M6 · FEM A6
Critical
Health: 34/100
Anomalies: 12
Downtime: 18h
Last PM: Mar 28
MTBF: 72h
IS:3177 Non-compliantFEM Overdue
Hydraulic Press Line B
500T · IS:3177 M5 · FEM L3
Warning
Health: 58/100
Anomalies: 7
Downtime: 8h
Last PM: Apr 5
MTBF: 156h
IS:3177 CompliantFEM Due Soon
Cooling Tower Unit 2
1200 m³/hr · IS:11592
Warning
Health: 61/100
Anomalies: 5
Downtime: 4h
Last PM: Apr 8
MTBF: 210h
IS:11592 Compliant
Boiler Feed Pump #1
150 m³/hr · IBR · IS:1520
Good
Health: 78/100
Anomalies: 2
Downtime: 1h
Last PM: Apr 10
MTBF: 480h
IBR CompliantIS:1520 Compliant
AI-powered failure prediction based on asset history and anomaly patterns
Maintenance Recommendations
EOT Crane #3P0 Urgent
Immediate bearing inspection and replacement
⏱ 4–6 hrs💰 ₹85,000
Hydraulic Press BP1 High
Relief valve replacement
⏱ 2–3 hrs💰 ₹45,000
Maintenance History
Asset Type Date Duration Cost Outcome
EOT Crane #3 Corrective Mar 28, 2026 6h ₹92,000 Resolved
Hydraulic Press B Preventive Apr 5, 2026 3h ₹28,000 Completed
Cooling Tower 2 Corrective Apr 8, 2026 2h ₹15,000 Partial
Boiler Pump #1 Preventive Apr 10, 2026 1.5h ₹12,000 Completed
AI-generated insights from 90 days of shift data
FyreOps has analyzed 847 shift messages, 312 handovers, and 156 anomalies over the last 90 days
🌙 Night shift has 2.3× more anomalies than morning 🏗️ EOT Crane #3 accounts for 31% of all critical flags 📉 Downtime reduced 18% since FyreOps deployment
Messages Processed
847
Briefs Generated
312
Anomalies Flagged
156
Avg Response Time
4.2 min
ROI Calculator
Inputs
Shifts per day
Avg downtime cost/hr
Anomalies prevented/month
Calculated Savings
Monthly savings₹36,00,000
Annual savings₹4,32,00,000
ROI Multiple
12.3×
IS:3177
3/4
Assets Compliant
Partial
Factories Act 1948
4/4
All Compliant
Compliant
FEM 1.001
2/4
Assets Compliant
Partial
Upcoming Compliance Deadlines
20
Apr
EOT Crane #3 — IS:3177 Certificate Renewal
Annual load test and structural inspection required
6 days
28
Apr
Boiler Pump #1 — FEM 1.001 Compliance Audit
Fatigue class verification and documentation
14 days
05
Jul
Hydraulic Press B — IS:3177 Annual Inspection
Scheduled preventive inspection
82 days
All Unread (3) Escalations Briefs
Notification Preferences
Email notifications
WhatsApp notifications
In-app notifications
Plant Profile
Shift Schedule
Team & Roles
Growth Plan
₹35,000/month · Next billing: May 1, 2026
Starter
₹15,000/mo
Current Plan
Growth
₹35,000/mo
Enterprise